Duck Pond Revitalization Project

Active Project

Duck Pond Revitalization Project

Project Description

Project Status: Construction

The Duck Pond Revitalization Project aims to replace aging infrastructure, enhance water quality, improve safety and accessibility, and reduce maintenance demands. With a projected construction period from late Fall 2024 to Spring 2025, the project is expected to significantly refresh one of the campus’s most iconic and historically significant landmarks. The revitalization of the duck pond will not change the shape, or character of the historic facility.

 

Project/Construction Manager:

Michael J Pierce, GB-98, UNM Facilities Design & Construction

 

 

Related Links:

Budget

$4,000,000

Square Footage

32,800 GSF

Architect

Pland Collaborative

Contractor

AquaticConsultants

Funding

FY 2023 Institutional Bonds